Email:info@ajfloor.com      Tel:+86-519-81180766
Pavement

369-sitching

4/5 stagger-sitching  

cross-sitching  

DIY
Preparation

1.The surface of floor must be completely dry.Please note that even though the floor may appear dry,it may still retain moisture.


2.Any paint,dirt,debris,etc.must be completely removed from the floor before installation.


3.Ensure that floor surface is flat and level.


4.Maintain room temperature above 15℃(59℉) before installation.Flooring products must be kept in the environment for at least 24 hours before installation begins.


Installation
1.Pave starts from the corner

At the time of engagement, clean the short female groove and insert the short male groove of the second plate into it at the angle of 45 degrees, then press gently to make it tight. Complete the first row in order.


2.Long side pavement

The female groove should be cleaned up when pave the long side. Insert the long male groove into the female groove of the upper row at the angle of 45 degrees.

3.Combine long and short side

Insert the long male groove into the female groove of the upper row at the angle of 45 degrees. Insert the female groove of the second row into the male groove of the upper row and press it gently to make it completely close. And so on to the last.

4.Push in place

When paving the last row, align the floor to be cut on the upper floor, and then affix the  complete floor to the wall and cut along the edge of the female groove.

Install video
Contact us
Changzhou Aojia Decorate Material CO.,LTD
Phone:+86-13775068212
Fax:+86-519-81297566  
Address: No.6 Hengluo Road, Henglin Town,
               Wujin District, Changzhou City
Benefit of SPC flooring
High-Density Rigid Core
Extremely stable
Safe & Sustainable
Water-proof
Superior Indentation Resistance
Products
Deep Embossed
EIR
Crystal
Embossed
Long StripMarble & Stone
PVC Floor Molding
About us
Company
Room style
FAQ's
NEWS


Login
Login
Login by:
My Profile
leave a message
back to the top